Search the Site with 
General Characteristics Crew List Memorabilia Cruise Books About the Ship's Name History Homeports of USS Tattnall Image Gallery to end of page

USS Tattnall (DDG 19)

- decommissioned -

USS TATTNALL was the 18th ship in the CHARLES F. ADAMS - class of guided missile destroyers. Last homeported in Mayport, Fla., the USS TATTNALL was stricken from the Navy list on January 12, 1993, and was subsequently berthed at the Naval Inactive Ship Maintenance Facility (NISMF), Philadelphia, PA, until sold to Brownsville International Shipbreaking Corp where she was scrapped.

General Characteristics:Keel laid: November 14, 1960
Launched: August 26, 1961
Commissioned: April 13, 1963
Decommissioned: January 18, 1991
Builder: Avondale Shipyards, Inc., New Orleans, La
Propulsion system:4 - 1200 psi boilers; 2 geared turbines
Propellers: two
Length: 437 feet (133.2 meters)
Beam: 47 feet (14.3 meters)
Draft: 20 feet (6.1 meters)
Displacement: approx. 4,500 tons
Speed: 31+ knots
Aircraft:none
Armament: two Mk 42 5-inch/54 caliber guns, Mk 46 torpedoes from two Mk-32 triple mounts, one Mk 16 ASROC Missile Launcher, one Mk 13 Mod.4 Missile Launcher for Standard (MR) and Harpoon Missiles
Crew: 24 officers and 330 enlisted


Back to topback to top  go to endgo to the end of the page



Back to topback to top  go to endgo to the end of the page

Crew List:

This section contains the names of sailors who served aboard USS TATTNALL. It is no official listing but contains the names of sailors who submitted their information.


back to top  go to the end of the page



Back to topback to top  go to endgo to the end of the page

USS TATTNALL Cruise Books:


Back to topback to top  go to endgo to the end of the page

About the Ship's Name:

Josiah Tattnall was born on 9 November 1795 at Bonaventure, near Savannah, Ga. He was appointed midshipman on 1 January 1812 and attended the Naval School at Washington, D.C., until 1 August when he was assigned to the frigate CONSTELLATION. When his ship tried to slip out to sea, the strong British squadron operating in the Chesapeake Bay forced her to put into Norfolk, Va. CONSTELLATION remained bottled up in Hampton Roads for the duration of the War of 1812, but Tattnall and his comrades still managed to get into the fray. He was among the 100 or so sailors and marines assigned to the shore battery on Craney Island. On 22 June 1813, the British attempted to carry the island by storm in preparation for an attack on nearby Norfolk. Tattnall's battery and a force of American boats gave the attackers a sound rebuff that deterred the British from further attempts to take the city.

In April 1814, Midshipman Tattnall was detached from CONSTELLATION and, by 24 August, was in command of a force of employees from the Washington Navy Yard. He led them into battle at Bladensburg in an unsuccessful effort to stop the British advance on the American capital. On 14 October, he was ordered to Savannah for duty in EPERVIER. In May 1815, that sloop sailed for the Mediterranean with Commodore Stephen Decatur's squadron to chastise the Algerine pirates. On 17 June, she participated in the capture of the frigate MASHUDA and, two days later, of the brig ESTEDIO. In July, when EPERVIER was ordered back to the United States with dispatches, Tattnall remained in the Mediterranean in CONSTELLATION. In January 1817, he transferred to ONTARIO and returned in her to the United States.

Promoted to lieutenant on 1 April 1818, Tattnall was assigned to the frigate MACEDONIA on 30 June, and he sailed in her for the Pacific in November. He was detached from MACEDONIA on 30 August 1820 and returned to the United States. Ordered to Norfolk on 26 December 1822, he joined Commodore David Porter's squadron in schooner JACKALL. Lt. Tattnall served in the West Indies on an expedition to suppress piracy until he was detached on 4 May 1823. On 23 June 1824, Tattnall was ordered to CONSTITUTION for Mediterranean service. In March 1826, he transferred to BRANDYWINE and returned home in her in May. On the 15th of that month, he was granted six months leave, which was later extended into 1828.

Tattnall served in ERIE from October 1828 to August 1829 and then went on to survey the Tortugas until March 1830. Lt. Tattnall took command of schooner GRAMPUS on 15 April 1831 and cruised the West Indies and the Gulf of Mexico. In August 1832, he captured the Mexican pirate schooner MONTEZUMA, which had boarded and robbed an American ship on the high seas. He was detached from GRAMPUS in September 1832 and went on leave awaiting orders for almost four years before being ordered in, July 1836, to recruit men for Capt. Thomas ap Catesby Jones' survey and exploration expedition.

Tattnall was promoted to commander on 25 February 1836 and, in April, reported for a three-year tour of duty at the Boston Navy Yard. Following service with the Mediterranean and African squadrons, Comdr. Tattnall joined the Mosquito Division in the Gulf of Mexico in 1846, commanding the steam gunboat SPITFIRE. During the Mexican War, he took part in the attacks on Vera Cruz, San Juan d'Ulloa, and Tuxpan, and he suffered an arm wound. For his gallantry before Vera Cruz, the state of Georgia presented him with a sword.

In 1848 and 1849, he returned to shore duty at the Boston Navy Yard. On 5 February 1850, he was commissioned captain and, the following month, was given command of SARANAC. Next, he commanded the Pensacola Navy Yard from July 1851 to June 1854. From August 1854 to November 1855, Capt. Tattnall was flag captain in INDEPENDENCE to Commodore Mervine on the Pacific Station. At Hong Kong on 29 January 1858, he relieved Commodore Armstrong taking command of the East India Squadron, breaking his flag in SAN JACINTO. During his two years in the Far East, Commodore Tattnall came to the assistance of a British squadron under fire from the Barrier Forts at the mouth of the Pei Ho River and, on his return voyage early in 1860, carried the first diplomatic embassy from Japan to the United States.

At the outbreak of the Civil War, Capt. Tattnall held command of the Sackett's Harbor Station. Though he initially opposed secession, Tattnall resigned his commission on 21 February 1861 and a week later, Governor Joseph E. Brown commissioned Tattnall as the senior flag officer of the Navy of Georgia. On 26 March 1861, he received his commission as a captain in the Confederate Navy. Tattnall commanded Southern naval units during the defense of Port Royal until the harbor was captured by Union forces on 7 November 1861. From there, he moved to overall command of the defense of Virginia's waters early in March 1862. Tattnall, by then a flag officer in the Confederate Navy as well as the Navy of Georgia, directed CSS JAMESTOWN and other warships in captures of Federal merchantmen off Sewell's Point in April 1862.

On 11 May 1862, in the face of advancing Federal forces, Flag Officer Tattnall ordered the destruction of his flagship, CSS VIRGINIA (ex-MERRIMACK). He was later acquitted by a court martial of all charges stemming from that action. He resumed command of the naval defense of Georgia on 29 May 1862 and retained it until 31 March 1863, when he turned over command of forces afloat to Comdr. Richard Page and concentrated upon the shore defenses of Savannah. When Savannah fell to General Sherman's troops, Tattnall became a prisoner of war. He was paroled on 9 May 1865 and, soon thereafter, took up residence once more in Savannah. Capt. Tattnall died there on 14 June 1871 and was buried in Bonaventure Cemetery.


Back to topback to top  go to endgo to the end of the page

USS TATTNALL History:

USS TATTNALL, the eighteenth CHARLES F. ADAMS-class guided missile destroyer, was laid down on November 14, 1960, by Avondale Marine Ways, Inc., at New Orleans, Louisiana. She was launched on August 26, 1961, sponsored by Mrs. Mary Adams Mason, and commissioned at Charleston, South Carolina, on April 13, 1963, with Commander William F. Regan in command. Following commissioning, TATTNALL conducted sea trials and tested her Tartar surface-to-air missile and ASROC antisubmarine weapon systems in operating areas off Charleston, Jacksonville, Florida, and San Juan, Puerto Rico. She subsequently completed shakedown training in the Caribbean and returned to Charleston on October 20 for post-shakedown repairs and modifications.

During 1964, TATTNALL operated along the eastern seaboard and in the Caribbean before departing Charleston on September 8 for her first overseas deployment. She participated in NATO Exercise TEAMWORK in the Norwegian Sea and Bay of Biscay, conducting air-defense and antisubmarine warfare exercises with allied naval forces. Following the exercise, she visited Portsmouth, England, on October 3 and Edinburgh, Scotland, on October 12, before returning to Charleston on October 22. On December 7, TATTNALL departed for her first Mediterranean deployment. She passed through the Strait of Gibraltar on December 14 and joined the U.S. Sixth Fleet, participating in multinational exercises and visiting Tunis, Tunisia; Genoa and Naples, Italy; Marseille and Theoule, France; and Barcelona, Spain. She departed the Mediterranean on March 4, 1965, and returned to Charleston on March 14.

During the remainder of 1965, TATTNALL participated in several operational research projects sponsored by the Chief of Naval Operations. These included extensive evaluations of the ship's air-defense capabilities, missile systems and combat readiness. Following completion of the trials in December, she prepared for another Sixth Fleet deployment. TATTNALL departed Charleston on February 15, 1966, and participated in the Franco-American Exercise FAIRGAME IV from February 27 to March 3. During the deployment, she monitored Soviet naval vessels on May 17 and participated in Exercise DEEP SIX in June. Her Mediterranean port visits included Rhodes, Thessaloniki and Volos, Greece; Palma de Mallorca, Spain; and Istanbul, Turkey. She departed Palma on July 1 and returned to Charleston on August 22.

Immediately after her return, TATTNALL entered Charleston Naval Shipyard for her first major overhaul, which lasted from August 22, 1966, until March 7, 1967. Following trials and refresher training, she resumed Atlantic and Caribbean operations. After visiting New York City from July 12 to 19, she prepared for another Mediterranean deployment, which continued through January 1968. TATTNALL returned to Charleston in early February 1968 and operated along the southeastern United States coast and in the Caribbean until June. She then crossed the Atlantic, visited the Azores and participated in Kiel Week celebrations in West Germany before continuing to the Mediterranean for another period of Sixth Fleet operations. She remained in the Mediterranean until mid-November and subsequently returned to Charleston.

On July 29, 1969, TATTNALL arrived at Naval Station Mayport, Florida, which became her new homeport for the remainder of her commissioned service. From September 2 to 24, she participated in NATO Exercise PEACEKEEPER in northern European waters. She then visited Amsterdam, Netherlands, beginning September 24, followed by antisubmarine warfare exercises and port calls at Hamburg, West Germany; Bergen, Norway; Edinburgh, Scotland; and Le Havre, France. TATTNALL returned to Mayport on December 10.

During 1970, TATTNALL participated in fleet exercises and supported research conducted by the Naval Research Laboratory in Chesapeake Bay. Later that year, she entered Charleston Naval Shipyard for her second regular overhaul, which continued until March 24, 1971. After completing post-overhaul trials, she returned to Mayport on April 22 and resumed operations in the Caribbean and Gulf of Mexico. On September 16, TATTNALL departed for northern Europe to participate in NATO Exercise ROYAL KNIGHT. The deployment included visits to Rosyth, Scotland, and Rotterdam, Netherlands, before she returned to Mayport on October 22.

In March 1972, TATTNALL departed for another Mediterranean deployment with the Sixth Fleet. During the following six months, she participated in multinational air-defense, antisubmarine warfare and surface warfare exercises. Her port visits included Valencia, Spain; Genoa and Naples, Italy; Patras and Athens, Greece; Kusadasi and Iskenderun, Turkey; Sousse, Tunisia; Menton, France; and ports in Sicily. On August 28, she transferred to Second Fleet operational control and began her return passage across the Atlantic, arriving at Mayport on September 5.

Following further Atlantic Fleet operations, TATTNALL participated in a joint American-French naval exercise off Charleston beginning May 29, 1973. She subsequently visited Norfolk, Virginia, and the U.S. Naval Academy at Annapolis, Maryland, before returning to Mayport on June 18. In July, she departed on her first UNITAS deployment to South America. The deployment involved exercises with the navies of several South American countries, including antisubmarine warfare, communications, gunnery and combined surface operations. TATTNALL visited ports in Brazil, Colombia, Peru and Uruguay before returning to Mayport on December 15.

On July 22, 1974, TATTNALL entered a two-month restricted availability at Charleston and returned to Mayport on September 21 to prepare for another Mediterranean deployment. She departed on November 25 and joined the Sixth Fleet at Rota, Spain, on December 5. After operational assignments in the Mediterranean and a brief visit to Gaeta, Italy, she arrived at Barcelona on December 18. On January 6, 1975, she proceeded to Rapallo, Italy, for an eight-day port visit, followed by La Spezia and an extended maintenance availability at Naples from January 18 to February 23. Subsequent calls included Sousse, Tunisia, from late February until March 4, Souda Bay, Crete, from March 6 to 7, and Palermo, Sicily, from March 9 to 14.

During March and April 1975, TATTNALL participated in Sixth Fleet exercises with USS FORREST SHERMAN (DD 931) and other units of Carrier Task Group 60.2. These included operations in the Strait of Messina, antisubmarine warfare exercises with USS STURGEON (SSN 637), and the amphibious exercise SARDINIA 75 on April 20. Additional antisubmarine training was conducted with USS GATO (SSN 615) and the Italian destroyer INTREPIDO (D 571). TATTNALL also visited Palma de Mallorca from March 19 to April 5 and Barcelona from April 10 to 18 before proceeding to Rota.

On May 5, 1975, TATTNALL joined USS LEAHY (CG 16) at Portsmouth, England, for a visit to the Soviet Union. The two American warships arrived at Leningrad on May 12 for a five-day port visit commemorating the thirtieth anniversary of the Allied victory in Europe during World War II. The visit formed part of a reciprocal naval exchange between the United States and the Soviet Union during the period of détente. Following their departure on May 17, the ships returned toward western Europe, stopping at Kiel, West Germany, for two days before proceeding to Portsmouth from May 23 to 25. TATTNALL subsequently crossed the Atlantic and arrived at Mayport on June 6.

Following a period of training and preparations, TATTNALL departed Mayport in late September 1975 for a major overhaul at Philadelphia Naval Shipyard. She arrived at Philadelphia on October 4, and work began two days later. The overhaul included modifications to her weapons, communications and engineering systems and continued until August 6, 1976. TATTNALL returned to Mayport on August 12 and subsequently conducted weapons-system trials, missile exercises and refresher training at Guantanamo Bay, Cuba, from October 8 to November 10. After completing naval gunfire support qualification in Puerto Rican waters, she returned to Mayport on November 20 and underwent maintenance alongside USS YOSEMITE (AD 19).

From January 29 to February 10, 1977, TATTNALL participated in Exercise CARIBEX 2-77 in the Caribbean. On March 30, she departed Mayport for another extended Mediterranean deployment with the Sixth Fleet. During the deployment, she conducted carrier screening, air-defense and antisubmarine warfare operations and participated in exercises with allied naval forces. TATTNALL returned to Mayport on October 21. During January and February 1978, she remained assigned to Atlantic Fleet readiness operations, including exercises with the battle group centered on USS DWIGHT D. EISENHOWER (CVN 69) off Puerto Rico.

On June 12, 1978, TATTNALL departed Mayport for a six-month deployment with the Standing Naval Force Atlantic, NATO's permanent multinational naval force. Following refueling stops at Bermuda and the Azores, she arrived at Den Helder, Netherlands, where she relieved USS PHARRIS (FF 1094) on June 23. During the following months, TATTNALL operated in northern European waters and visited Rosyth, Rothesay and Glasgow, Scotland; Tromso and Bergen, Norway; and Zeebrugge, Belgium. On September 1, she began participation in NATO Exercise NORTHERN WEDDING, conducting screening and naval gunfire support operations for allied amphibious forces in the Shetland Islands and Jutland areas. The exercise continued through September despite severe weather in the North Atlantic.

Following NORTHERN WEDDING, TATTNALL visited Portsmouth, England, beginning September 19, where engineering problems delayed her departure until October 14. She subsequently rejoined NATO forces for additional air-defense exercises off Scotland. The remainder of the deployment included visits to Rotterdam, Netherlands, from October 20 to 26; Aarhus, Denmark, from November 2 to 5; Copenhagen from November 10 to 14; Kiel, West Germany, from November 18 to 21; and Lisbon, Portugal, from December 2 to 5. TATTNALL returned to Mayport on December 16, 1978.

During the first half of 1979, TATTNALL underwent maintenance and participated in Atlantic Fleet training exercises. On April 8, members of her rescue and assistance detail helped fight a fire aboard USS MANLEY (DD 940) while both ships were berthed at Mayport. From April 30 to May 12, TATTNALL underwent drydocking at Jacksonville Shipyards for hull maintenance and repairs. During August, she participated in Composite Training Unit Exercise 3-79, conducting missile firings, antisubmarine rocket launches and torpedo exercises. Further training off Puerto Rico in October included naval gunfire support qualification at Vieques.

On November 27, 1979, TATTNALL departed Mayport for a deployment to the Mediterranean and Middle East during the Iranian hostage crisis, which had begun with the seizure of the American Embassy in Tehran on November 4. During the Atlantic crossing, she conducted a turnover with USS MAHAN (DDG 42) near the Azores. After arriving at Rota, Spain, on December 9, she joined the battle group centered on USS FORRESTAL (CV 59) and participated in Exercise MULTIPLEX 1-80 from December 14 to 20. She subsequently visited Genoa, Italy, for the Christmas and New Year holidays.

TATTNALL departed Genoa on January 4, 1980, and visited Bari, Italy, from January 9 to 14 before conducting missile exercises at Souda Bay, Crete, on January 16. After further Sixth Fleet operations, she visited Athens, Greece, from January 25 to 31. On February 3, TATTNALL transited the Suez Canal into the Red Sea and relieved USS CLAUDE V. RICKETTS (DDG 5) of Middle East Force duties. Accompanied by USS KOELSCH (FF 1049), she proceeded around the Arabian Peninsula, stopping at Djibouti on February 7 before entering the Persian Gulf on February 13.

During her Persian Gulf assignment, TATTNALL conducted maritime surveillance, air-defense and escort operations in support of the Middle East Force during the continuing crisis involving American hostages in Iran. She provided protection for the Middle East Force flagship USS LA SALLE (AGF 3) and monitored shipping in the Persian Gulf and Strait of Hormuz. TATTNALL visited Bahrain from March 15 to 17 before beginning her return passage. After refueling at Djibouti on March 22, she made a two-day goodwill visit to Berbera, Somalia, and returned to Djibouti on March 29. She passed northward through the Suez Canal on April 3, underwent repairs at Naples from April 7 to 22 and subsequently visited Rota. Accompanying the FORRESTAL battle group, TATTNALL returned to Mayport on May 7, 1980.

Following her return, TATTNALL underwent maintenance alongside YOSEMITE and resumed Atlantic and Caribbean operations. On July 2, she deployed at short notice as flagship of Destroyer Squadron 24 for exercises near Key West, Florida, with a task group that included KOELSCH, USS TRUETT (FF 1095) and USS MANITOWOC (LST 1180). In August, TATTNALL departed on a goodwill cruise to Latin America, visiting Veracruz, Mexico, from August 23 to 26 and Puerto Cortes, Honduras, from August 30 to 31. Shortly after leaving Honduras, an electrical fire in the after engine room caused significant damage. After further operations in the Caribbean and Bahamas, she returned to Mayport for repairs and deployment preparations.

On January 11, 1981, TATTNALL departed Mayport for another deployment to the Indian Ocean and Persian Gulf, joining USS BLAKELY (FF 1072) the following day. After stops at Bermuda and Rota, the ships passed through the Strait of Gibraltar on January 24. TATTNALL arrived at Port Said, Egypt, on January 30 and transited the Suez Canal on January 31. Following a refueling stop at Djibouti on February 3, she joined Task Group 70.9 in the Indian Ocean. From February 12 to 14, she underwent maintenance alongside USS JASON (AR 8) at Diego Garcia.

On February 18, 1981, TATTNALL joined the battle group centered on USS INDEPENDENCE (CV 62) for Exercise GONZO 1-81. She continued operations with the carrier until February 27, when she detached for the Persian Gulf to relieve USS JONAS INGRAM (DD 938) and USS BARNEY (DDG 6). During the following months, TATTNALL conducted surveillance and maritime security patrols in the Persian Gulf, interspersed with visits to Bahrain and Dammam, Saudi Arabia, including a port call at Dammam on May 13 and 14. After being relieved by USS BIGELOW (DD 942), she departed the region on May 18 and began the return passage with BLAKELY.

On May 26, 1981, TATTNALL struck an uncharted underwater object while completing her northbound passage through the Suez Canal, damaging her starboard propeller. She proceeded to Málaga, Spain, where divers from USS EDENTON (ATS 1) carried out repairs between June 1 and 6. TATTNALL passed through the Strait of Gibraltar on June 7 and returned to Mayport on June 18. From July 20 to 30, she participated in the NATO fleet exercise OCEAN VENTURE before preparing for an extensive modernization.

On August 26, 1981, TATTNALL departed Mayport for Philadelphia Naval Shipyard, arriving on August 31. The overhaul began with her entry into drydock on September 9 and continued through November 1982. TATTNALL became the first CHARLES F. ADAMS-class destroyer to receive the Navy's comprehensive antiair warfare modernization package. The work included installation of the Naval Tactical Data System (NTDS), improvements to sensors and fire-control equipment, modernization of the guided missile system and the addition of Harpoon antiship missile capability. Engineering and combat-system repairs were also carried out during the 15-month availability. Following completion of trials, TATTNALL departed Philadelphia on November 27, 1982, and returned to Mayport on December 3.

During the first half of 1983, TATTNALL completed post-overhaul weapons trials, combat-system qualifications and refresher training in the Atlantic and Caribbean. On September 29, she departed Mayport for a Mediterranean deployment, visiting Recife and Salvador, Brazil, before joining the battle group centered on USS JOHN F. KENNEDY (CV 67) for the Atlantic crossing. Her original deployment schedule included operations in the Indian Ocean, but the deterioration of the situation in Lebanon resulted in her assignment to the eastern Mediterranean. Following the suicide bombing of the U.S. Marine barracks in Beirut on October 23, which killed 241 American military personnel, TATTNALL proceeded to the Lebanese coast. She arrived off Beirut on November 3 to provide naval gunfire support and air-defense coverage for American forces serving with the Multinational Force in Lebanon.

On December 13, 1983, TATTNALL and USS TICONDEROGA (CG 47) opened fire with their 5-inch guns against Syrian antiaircraft positions in the mountains east of Beirut after American reconnaissance aircraft came under fire. The ships fired approximately 50 rounds, and TATTNALL reported the destruction of her two assigned targets. On December 18, the two ships again fired on Syrian positions following attacks against American aircraft, with further naval gunfire operations taking place on December 19. These engagements occurred amid the increasing involvement of American naval forces in the Lebanese conflict.

On January 15, 1984, TATTNALL and USS NEW JERSEY (BB 62) provided naval gunfire support after American Marine positions around Beirut International Airport came under rocket, mortar and artillery fire. The ships fired against hostile positions in the hills east of the city. TATTNALL continued operating off Lebanon until January 24, when a serious fire broke out aboard the destroyer. USS CLAUDE V. RICKETTS, which was operating nearby, assisted during the emergency. The fire caused extensive damage to TATTNALL's combat systems, disabling her antiaircraft warfare capability and impairing her Harpoon missile system. She subsequently departed the operating area for Naples, Italy, where the damage was assessed. TATTNALL then returned to the United States, arriving at Mayport on February 24.

During the remainder of 1984, TATTNALL underwent extensive repairs to her fire-damaged equipment and engineering plant. She conducted limited training operations in June and hosted the West German destroyer FGS MÖLDERS (D 186) at Mayport in August. Additional machinery problems delayed her return to full operational readiness during the autumn. Following sea trials in November, she continued maintenance and combat-system testing into early 1985.

In March 1985, TATTNALL departed Mayport for six weeks of refresher training at Guantánamo Bay, Cuba. During this period, she responded to a request for assistance from USS CORAL SEA (CV 43), which had collided with the Ecuadorian tanker NAPO off Cuba on April 11. The carrier subsequently regained sufficient maneuverability to proceed without TATTNALL's assistance. After returning to Mayport, TATTNALL visited Mobile, Alabama, in connection with celebrations marking the opening of the Tennessee-Tombigbee Waterway. Further weapons qualifications and readiness exercises in Puerto Rican waters followed during the summer.

On October 7, 1985, TATTNALL departed Mayport for another deployment to the Middle East in company with USS CONOLLY (DD 979), USS GALLERY (FFG 26) and USS BOONE (FFG 28). After stops at Bermuda, Rota and Palma de Mallorca, she passed through the Suez Canal in late October and proceeded to the Persian Gulf. In early November, TATTNALL relieved USS LYNDE McCORMICK (DDG 8) and began operations with the Middle East Force. During the following months, she maintained radar surveillance stations in coordination with U.S. Air Force E-3 AWACS aircraft operating from Saudi Arabia. Her assignments included maritime surveillance, air-defense patrols and escort duties during the Iran-Iraq War and the associated attacks against merchant shipping in the Persian Gulf. Port visits included Bahrain, Dubai in the United Arab Emirates and Al Jubayl, Saudi Arabia, where the crew spent Christmas.

On January 24, 1986, TATTNALL proceeded to the Gulf of Oman for escort operations before returning to the Persian Gulf for additional surveillance patrols. On February 8, she visited Karachi, Pakistan, and subsequently conducted communications and tactical exercises with units of the Pakistani Navy in the northern Arabian Sea. Further operations in the Arabian Sea and Persian Gulf followed, together with maintenance and replenishment visits to Bahrain. On March 7, USS LUCE (DDG 38) relieved TATTNALL of her Middle East Force duties in the Gulf of Oman. She then proceeded through the Red Sea and transited the Suez Canal northbound on March 17. After visits to Barcelona from March 22 to 25 and Rota on March 26, TATTNALL returned to Mayport on April 8, 1986.

Following her return, TATTNALL underwent a series of maintenance periods, engineering inspections and local training operations. In September 1986, she began an extended maintenance availability at Mayport. Additional work on the underwater hull required drydocking at Jacksonville Shipyards, where she arrived under tow on January 13, 1987. The drydock period continued until April 9, and TATTNALL returned to Mayport the following day. After sea trials and machinery inspections, she departed on June 5 for refresher training at Guantánamo Bay, which continued from June 9 to July 16. The ship subsequently completed weapons exercises off Puerto Rico, including missile firings and naval gunfire support qualifications, before entering another maintenance period at Mayport in September. She returned to operational readiness in December.

On January 11, 1988, TATTNALL departed Mayport with LUCE for fleet exercises in the Caribbean involving a two-carrier battle group. On February 29, she began another Mediterranean deployment in company with LUCE and USS VREELAND (FF 1068). During the Atlantic crossing, TATTNALL operated with the battle group centered on DWIGHT D. EISENHOWER. She passed through the Strait of Gibraltar on March 11 and relieved CLAUDE V. RICKETTS on March 15. Subsequent Mediterranean operations included visits to Palma de Mallorca from March 18 to 25, Genoa, Italy, from March 29 to April 5, and Villefranche-sur-Mer, France, from April 11 to 15. After exercises at Augusta Bay, Sicily, she visited Taranto, Italy, from April 26 to 29.

During May 1988, TATTNALL participated in NATO Exercise DRAGON HAMMER and continued operations in the eastern Mediterranean. She visited Antalya, Turkey, from May 23 to 26 and Haifa, Israel, from May 29 to June 3. On June 6, she entered Gölcük, Turkey, for a two-week port and maintenance visit. After departing on June 20, TATTNALL passed through the Bosporus into the Black Sea and visited Constanta, Romania, from June 21 to 24. The visit took place during a period of continuing American naval operations in the Black Sea under the Montreux Convention. Following her departure, she returned through the Turkish Straits and visited Antalya from June 28 to 30 before proceeding to Haifa for another extended port call in July.

TATTNALL subsequently visited Cannes, France, from July 26 to August 1 and Gibraltar from August 4 to 18. On August 14, USS MacDONOUGH (DDG 39) relieved her of Sixth Fleet duties. TATTNALL departed the Mediterranean and returned to Mayport on August 29, 1988. During the autumn, she visited Wilmington, North Carolina, and Port Everglades, Florida, before completing an Inspection and Survey (INSURV) from November 14 to 18. The inspection resulted in a satisfactory assessment of the ship's material condition and operational capabilities.

On January 19, 1989, TATTNALL entered drydock for boiler repairs, hull maintenance and painting. Following sea trials and additional maintenance, she returned to Mayport on May 19. During July, she conducted refresher training at Guantanamo Bay. While operating with a Coast Guard detachment embarked, TATTNALL intercepted a small Haitian sailing vessel carrying approximately 150 refugees toward the United States. After Coast Guard personnel removed the passengers, the abandoned vessel was sunk because it presented a hazard to navigation. TATTNALL subsequently visited Ocho Rios, Jamaica, and Roosevelt Roads, Puerto Rico, before returning to Mayport. Additional missile exercises, fleet training and maintenance continued through the remainder of 1989.

On March 8, 1990, TATTNALL departed Mayport for her final Mediterranean deployment, operating with the battle group centered on DWIGHT D. EISENHOWER. She joined the Sixth Fleet on March 20 and participated in Exercise NATIONAL WEEK before undergoing a maintenance availability alongside USS SIERRA (AD 18) at Naples, Italy, until April 17. On April 19, she arrived at Trieste, Italy, to join Naval On-Call Force Mediterranean (NAVOCFORMED), a multinational NATO naval formation. During the following months, TATTNALL participated in Exercise DRAGON HAMMER and other combined operations with allied naval forces. Her Mediterranean itinerary included Cagliari, Italy; Barcelona, Spain; Marseille and Toulon, France; and ports in Algeria and Tunisia. She also underwent a further maintenance availability alongside SIERRA at Palma de Mallorca.

After visiting Toulon from July 26 to August 1, 1990, TATTNALL proceeded to the eastern Mediterranean for Exercise FLASHING SCIMITAR. Following Iraq's invasion of Kuwait on August 2, the destroyer received orders to support Operation DESERT SHIELD, which had been initiated to protect Saudi Arabia and assemble international forces in response to the invasion. On August 19, TATTNALL entered the Red Sea to participate in the American naval deployment to the region. She subsequently returned northward through the Suez Canal on August 22, proceeding to the Mediterranean after her brief assignment in support of DESERT SHIELD. USS SAMPSON (DDG 10) assumed her remaining operational responsibilities, allowing TATTNALL to begin her final return passage.

TATTNALL arrived at Mayport on September 8, 1990, and entered a period of post-deployment maintenance and preparations for decommissioning. During October, she visited Fort Lauderdale, Florida, for Fleet Appreciation Week before returning to Mayport. USS TATTNALL was decommissioned on January 18, 1991, after nearly 28 years of commissioned service. She was stricken from the Naval Vessel Register on January 12, 1993, and subsequently remained in custody at the Naval Inactive Ship Maintenance Facility in Philadelphia, Pennsylvania. On February 10, 1999, the former destroyer was sold for scrapping to International Shipbreaking Ltd. of Brownsville, Texas. She departed Philadelphia under tow by the salvage tug ELSBETH III on March 18, 1999, and was dismantled at Brownsville between April 12, 1999, and March 22, 2000.


Back to topback to top  go to endgo to the end of the page

Homeports of USS TATTNALL:

PeriodHomeport
commissioned at Charleston, SC.
1963 - 1969Charleston, SC.
1969 - 1991Mayport, FL.


Back to topback to top  go to endgo to the end of the page



Back to topback to top



Back to Destroyer list. Back to ships list. Back to selection page. Back to 1st page.