![]() |
Search the Site with
|

Originally placed in service as Floating Workshop YR 50, the barge was later redesignated YRBM 50 and is presently one of the Navy's non self-propelled Repair, Berthing and Messing Barges.
| General Characteristics: | Awarded: October 15, 1942 |
| Keel laid: January 3, 1944 | |
| Launched: July 10, 1944 | |
| Delivered: September 22, 1944 | |
| Builder: Mare Island Naval Shipyard, Vallejo, Calif. | |
| Length: 150 feet (45.7 meters) | |
| Beam: 43 feet (13.1 meters) | |
| Draft: 7 feet (2.1 meters) | |
| Displacement: approx. 600 tons (light displacement) | |
| Accommodations: 1 Officer, 40 Enlisted | |
| Homeport: Pacific |
YRBM 50 Image Gallery:
The photos below were taken by Michael Jenning and show YRBM 50 at the Puget Sound Naval Shipyard, Bremerton, Wash., on October 13, 2017.
![]() | ![]() | ![]() |
Back to Repair, Berthing and Messing Barges Page.
Back to Service Craft List.
Back to Selection Page.
Back to 1st Page.