![]() |
Search the Site with
![]() |
Originally placed in service as Floating Workshop YR 46, the barge was later redesignated YRBM 49 and is presently one of the Navy's non self-propelled Repair, Berthing and Messing Barges.
General Characteristics: | Keel laid: April 22, 1943 |
Launched: May 15, 1943 | |
Delivered: November 26, 1943 | |
Builder: Cramp Shipbuilding Philadelphia, Pa. | |
Length: 150 feet (45.7 meters) | |
Beam: 36 feet (11 meters) | |
Draft: 6 feet (1.8 meters) | |
Displacement: approx. 760 tons | |
Accommodations: 1 Officer, 40 Enlisted | |
Homeport: Pearl Harbor, Hi. |
YRBM 49 Image Gallery:
The photo below was taken by Michael Jenning and shows YRBM 49 at the Pearl Harbor Naval Shipyard, Hi., on October 14, 2017.
![]() |
The photo below was taken by Sebastian Thoma and shows YRBM 49 at Naval Station Pearl Harbor, Hi., on March 18, 2022.
![]() |