Search the Site with 
General Characteristics Crew List Memorabilia Cruise Books History Image Gallery to end of page

USS Saipan (CVL 48)

- decommissioned -
- later AVT 6 -
- later USS ARLINGTON (AGMR 2) -


USS SAIPAN was the first of two ships in the SAIPAN - class of light aircraft carriers. Unlike the light aircraft carriers of the INDEPENDENCE - class, the SAIPAN was built from the keel up as an aircraft carrier.

USS SAIPAN was the first ship in the Navy named after the island in the Marianas; the site of the initial Allied landings in that group on June 15, 1944. After bitter fighting ashore and at sea, the island was secured in mid-July and developed into an Allied air base. The SAIPAN was decommissioned on October 3, 1957. Reclassified as AVT 6, the ship was converted to a communications major relay ship in the mid-1960s. Renamed ARLINGTON, she was recommissioned as USS ARLINGTON (AGMR 2) on August 27, 1966. She remained in service until January 14, 1970, when she was decommissioned at San Diego, Calif. The ship was sold for scrapping in 1976.

General Characteristics:Awarded: 1943
Keel laid: July 10, 1944
Launched: July 8, 1945
Commissioned: July 14, 1946
Decommissioned: October 3, 1957
Builder: New York Shipbuilding, Camden, N.J.
Propulsion system: geared turbines, 120,000 shp
Propellers: four
Length: 684 feet (208 meters)
Beam: 115 feet (35 meters)
Draft: 28 feet (8.5 meters)
Displacement: 14,500 tons
Speed: 33 knots
Aircraft: 50+
Catapults: two
Aircraft Elevators: two
Armament: 40 40mm Bofors guns, 25 20mm guns
Crew: 1721


Back to topback to top  go to endgo to the end of the page



Back to topback to top  go to endgo to the end of the page

Crew List:

This section contains the names of sailors who served aboard USS SAIPAN. It is no official listing but contains the names of sailors who submitted their information.


back to top  go to the end of the page



Back to topback to top  go to endgo to the end of the page

USS SAIPAN Cruise Books:


Back to topback to top  go to endgo to the end of the page

USS SAIPAN History:

SAIPAN was laid down on 10 July 1944 by the New York Shipbuilding Corp., Camden, N.J.; launched on 8 July 1945; sponsored by Mrs. John W. McCormack; and commissioned on 14 July 1946, Capt. John G. Crommelin in command.

Commissioned eleven months after the close of World War II, SAIPAN trained student pilots out of Pensacola from September 1946 to April 1947 when, reassigned to Norfolk as homeport, she departed the Gulf of Mexico; participated in exercises in the Caribbean; then proceeded to Philadelphia for overhaul. In November, she returned to Pensacola; but, in late December, after training midshipmen, steamed back to the east coast to serve with the Operational Development Force.

In February 1948, however, her work in jet operational techniques, carrier support tactics, and electronic instrument evaluation was interrupted briefly. From the 7th to the 24th, she was engaged in transporting the United States delegation to the Venezuelan Presidential inauguration and back. On her return, she conducted local operations off the Virginia Capes; and, in April, after a visit to Portsmouth, N.H., she resumed work for the Operational Development Force. On the 18th, she also relieved MINDORO (CVE 120) as flagship of Carrier Division 17 (CarDiv 17).

On 19 April, she departed Norfolk for Quonset Point, R.I., where, on 3 May, she embarked Fighter Squadron 17A. Three days later, all squadron pilots had qualified in FH-1 Phantom jets. The squadron had become the first carrier-based jet squadron.

Back at Norfolk by the end of the month, SAIPAN was relieved of flagship duties. In June, she returned to New England waters; and, in July, she commenced overhaul at Norfolk. In December, she resumed local operations. On the 24th, she was ordered to embark two of the Navy's latest type helicopter, the XHJS-1, and three Marine Corps HRP-1 helicopters and proceeded north to Greenland to assist in the rescue of eleven airmen downed on the icecap. Departing Norfolk on Christmas day, the CVL arrived off Cape Farewell on the 28th and prepared to launch the helicopters as soon as weather allowed. On the 29th, however, a C-47, equipped with jet assist takeoff and skis, landed on the ice; took on the marooned airmen; and made it out again.

SAIPAN then returned to Norfolk; arrived on the 31st, and sailed again on 28 January 1949. Steaming south, she conducted exercises out of Guantanamo Bay into March and returned to Hampton Roads on the 10th. From the 11th to the 19th, she conducted operations for the development force; then made a reserve training cruise to Canada. At the end of May, she again commenced work for the Operational Development Force. Three months later, she conducted her second reservist cruise of the year, then qualified Royal Canadian Navy pilots in carrier landings.

From November 1949 to March 1951, SAIPAN remained on the east coast, operating from the Virginia Capes south. On 6 March 1951, she got underway as flagship, CarDiv 14, and sailed for duty with the 6th Fleet. Deployed for three months, she plied the waters of the western Mediterranean until the end of May, then headed for home. On 8 June, she was back at Norfolk, whence she resumed operations in the western Atlantic from Greenland to the Caribbean.

For over two years, SAIPAN continued 2d Fleet operations, interrupting them for midshipman cruises during the summers of 1952 and 1953 and for an overhaul. In October 1953, she departed the east coast and steamed for the Panama Canal and the Pacific. On 30 October, she arrived at San Diego, whence she continued on to Pearl Harbor, Yokosuka, and duty off the coast of Korea in support of the uneasy truce agreement.

Assigned to TF 95, she was primarily engaged in surveillance and reconnaissance missions along the coast and in inspection patrols of the islands just south of the 38th Parallel. In January 1954, she interrupted her patrols to provide air support for Japanese-manned LSTs ferrying former Chinese POWs from Inchon to new homes on Formosa. In early February, she participated in amphibious exercises in the Ryukyus, then returned to Inchon to stand by in the event she was needed for an evacuation of Indian troops from Panmunjom. In March, amphibious exercises took her to the Bonins. She then returned to Japan; but, instead of resuming truce patrols, she took on 25 AU-type aircraft and five H19A helicopters at Yokosuka and steamed south. On 18 April, VMA-324 pilots flew the AU's off her flight deck and landed them at Tourane (now Danang) Air Base, French Indo-China. There the aircraft were turned over to French forces. Later in the day, SAIPAN entered the harbor, offloaded spare parts and maintenance personnel, and departed for Manila.

On the 20th, she delivered the helicopters to Air Force personnel in the Philippines; and, at the end of the month, she resumed operations off the coast of Korea. On 8 May, she put into Sasebo; and, through the 24th, remained in Japanese waters. On the 25th, she got underway to return to Norfolk via the Suez Canal. On 20 July, she completed her round the world cruise.

In October, SAIPAN again sailed south to the Caribbean. Arriving as hurricane "Hazel" hit the Greater Antilles, razing areas of Hispaniola, the carrier was immediately assigned to relief work. From the 13th to the 20th, she delivered food and medical supplies and personnel to isolated areas of Haiti; then, after being honored by the Haitian government, she returned to Norfolk. On 1 November, she entered the shipyard there for overhaul; and, in April, resumed operations with a cruise to the Caribbean. In June, she was again attached to the aviation training center at Pensacola; and, through the summer, conducted qualification exercises. At the end of September, she was ordered to Mexico to again assist in hurricane relief work. From 1 to 9 October, her helicopters evacuated survivors, flew in rescue personnel, and distributed food, water, and medical supplies, primarily in the flooded Tampico area. On 12 October, she returned to Pensacola, where she remained until April 1957. On the first of that month, she sailed for Bayonne, N.J., where she began inactivation and was decommissioned on 3 October 1957.

Reclassified AVT 6 on 15 May 1959, SAIPAN remained in the Atlantic Reserve Fleet until March 1963. She then entered the Alabama Dry Dock and Shipbuilding Co. yard at Mobile to begin conversion to a command ship. Briefly designated CC 3, she was reclassified a Communications Major Relay ship (AGMR 2) on 1 September 1964 while still undergoing conversion. On 8 April 1965, she was renamed ARLINGTON, in honor of Arlington County, Va., the site of one of the Navy's first wireless test stations; and, on 12 August 1966, she completed her conversion. As ARLINGTON (AGMR 2) she sailed for Norfolk where she was recommissioned on 27 August 1966. She remained in service until 14 January 1970, when she was decommissioned at San Diego.


Back to topback to top  go to endgo to the end of the page



Back to topback to top



Back to Light Aircraft Carriers list. Back to Ships list. Back to selection page. Back to 1st page.